智能云台:内容


Swimming pool tile engineering overview

Jan 27 ,2019

Swimming pool project Swimming pool, competition pool and training pool, special swimming brick construction first with cement mortar leveling, tile adhesive paste tile, caulking agent caulking.

Construction preparation

1. All base surfaces should be firm, smooth, dry, clean, free of oil, wax-free and other debris.

2. For the oily base surface, first wash it with 10% caustic soda solution, then clean it with clean water, and wait for it to dry before proceeding to the next process.

Construction process

Concrete pool wall → additive for interface treatment → cement mortar screed screed (to be dried for 7 days) → waterproof treatment → interface treatment → tile adhesive tile → caulk caulk

Uses: National standard swimming pool, hotel pool, water plant reservoir.

Remarks: Due to the water pressure in the swimming pool and the hot weather, it is easy to cause arching or even bursting between bricks and bricks. Therefore, when the tile is laid, the spacing between the brick and the brick is 10mm.

 


Related Products
Previous: Hot Melt Glass Mosaic----Stream Wheat Series
Next: Cleaning and maintenance of glass mosaic tiles

Online Service
+86 15992310640